Brixham Marina
On behalf of MDL Marinas, TILT are planning and designing the replacement of a floating breakwater at the marina in Brixham.
TILT produced a detailed wave modelling study using MIKE 21 to define the effectiveness of the pontoon system.
TILT completed a structural inspection and designed the replacement system including piling to support the procurement of a Contractor.
Completion is expected in 2024.