Brixham Marina

On behalf of MDL Marinas, TILT are planning and designing the replacement of a floating breakwater at the marina in Brixham. 

TILT produced a detailed wave modelling study using MIKE 21 to define the effectiveness of the pontoon system.

TILT completed a structural inspection and designed the replacement system including piling to support the procurement of a Contractor.

Completion is expected in 2024.

 

Previous
Previous

Oikos Jetty

Next
Next

Twyford Bridge